Corroborate for piping fabrication and erection for project.
Substantiate the Bill of Materials - BOM & Bill of Quantity – BOQ as per the requirement of the project.
Arrange Qualified Welders for Spool Fabrication.
Vindicate Spool Fabrication as per AFC (Approved for Construction) Drawings for each and every joints.
Vindicate each Joint No`s, Spool No`s, Dwg No`s, Sheet No`s on pipeline respectively.
Vindicate of Joint Orientation, Flange Orientation, and Flange Facing for each joint fit up and after welding.
Vindicate Bolt Tensioning & Bolt Torquing after installation of gaskets.
Arranging for flushing prior to Hydro Test.
Conducting Hydro testing as per given Test Pressure.
Flushing & Draining after Hydro Testing.
Coordinate with Project, Planning, Engineering, Materials, Maintenance and Quality to ensure trouble free shop
operation at all times.
Create engineering queries for any discrepancies in the drawing and communicate effectively for the seamless
functioning of the shop.
Coordinate manpower, equipment, and tools, jigs and fixtures requirement for execution of job.
Develop team spirit and control sub ordinates.
Maintain Kaizen atmosphere in the shop.
Selection of fabrication sequence, welding process and internal coating technique to attain the maximum productivity,
relatively less repair and rejection rate.
Resolving field problems and liaison client under the supervision of Engineering Section Department.
Formulate safe methodology for fabrication, installation, erection, pre commissioning and, painting considering the
Hazards involved and assess diligently risks and prepare the Risk assessment matrix.
Corroborate